New Features

Bar Coding for the Production Modules

Inventory can now be bar coded and scanned in order to;

  • Locate records
  • Add material to a Work Order

Document Training Record Management Improvements

The Lean Machine now provides more tools to manage document training records.  You can manage assignments from the Document, the Employee, or by Job Description. (Watch tutorial)

Database Splitting for Documents

The Lean Machine database can now be split in order to double the maximum data storage capacity. The Released Documents, Historical Documents, and Attachments can be stored in a separate database which will synchronize with the local copies of the other split document databases.

Design Control

The Inventory module is getting some new features to support the process of engineering BOM configuration that is subject to a ECN/ECR review process before the part/assembly is released to production.

Multiple DCO/ECR/ECN  Releases

Being able to release multiple documents with a single DCO/ECR/ECN form has been requested more than once.  This feature will be developed in conjunction with the Design Control feature above.

Training Module will now track Training Requirements

The Training module will now support setting up a master list of training events that you can use to establish training requirements by both job description and employee.

Help Files are incorporating training tutorials

The help files for The Lean Machine are going to be populated with animated tutorials.

Watch the first one for the Training module here.

Outlook 2007 Integration

The Lean Machine will now integrate with Outlook 2007.

QuickBooks Integration

You can keep track of our progress on the QuickBooks Integration page.



Bad Behavior has blocked 136 access attempts in the last 7 days.